JYD Roofing Drip Edge has unbeatable durability and is easy to install. Combined with a lifetime limited warranty and the strength you need for a professional appearance, our drip edge perimeter flashing, roof flashing, and metal valley offer infinite possibilities.
Available in a variety of material types and sizes to fit virtually all applications and color needs, from the smallest home to the largest commercial job.
| Technique | Cold Rolled Based |
| Color | Black, Brown, White, or customized as customer's request |
| Materials | Galvanized, Galvalume, Aluminum |
| Shape | FHA, T Type, 90 Degree, F5, F8, C Type, Z Type, and more |
| Length | 10ft, 12ft, or customized as requirement |
| Thickness | 0.015 inch - 0.018 inch (0.018 inch is most popular) |
| Zinc Coating | AZ150 or customized as customer's request |
| Package | 25 Pcs/Carton; 24 Cartons/Pallet; 24 Pallets/Container |
90 Degree Profile
90 Degree Dimensions
Black / White / Grey / Bronze or Customized
Prevents rainwater from running down the fascia board and underlying wood, avoiding rot and long-term structural moisture damage.
Acts as an impenetrable shield that blocks gusty winds from pushing driving rain underneath the shingles and roof deck.
Install the drip edge over the furring strip. Always install it on the eaves first.
Place the drip edge down, aligning it accurately so water will drip cleanly into the gutters.
Use roofing nails to securely fasten the drip edge onto the roof deck.
When you reach a corner where an eave and rake edge meet, make a proper cut to ensure an exact fit.
Install the remaining drip edge as normal along the designated edge line.
Once you’ve covered the eaves with the drip edge, it’s time to install your underlayment properly.
A common material for drip edges. While aluminum isn’t as strong as steel, it provides superior anti-corrosion properties and does not rust. It is often supplied in a wide array of painted colors to match the aesthetic of any home exterior.
Drip edges are designed to be in direct, continuous contact with water; steel drip edges are galvanized to reliably prevent rust. A minimum 26-gauge steel is preferable so that the drip edge can easily withstand strong winds and harsh weather.
Standard Delivery Time: Typically 20 - 30 days for prompt fulfillment.
Our company is mainly engaged in manufacturing drip edge, metal roof flashing, aluminum J trim, aluminum soffit, aluminum and metal siding, gutter apron, aluminum leafguard, aluminum gutter coils, aluminum trim coils, coil roofing nails, plastic cap nails, synthetic roofing underlayment, and related building accessories.
Our workshop spans an area of 15,000 square meters, equipped with more than 50 specialized modern production lines.
Our main market is North America, especially the USA and Canada. Our products are widely acclaimed and hold nearly 30% market share across key regions of North America.
A drip edge serves two vital protective functions: it directs water flow directly into gutters and away from the vulnerable fascia board, and it shields under-roof structures from moisture driven by high winds.
Aluminum offers complete rust immunity and matches exterior trim colors seamlessly. Galvanized steel (minimum 26-gauge) provides superior structural strength and wind-load resistance in extreme weather conditions.
Yes. We provide standard lengths of 10ft and 12ft with thicknesses of 0.015-0.018 inch, but width, thickness, profile angles (such as 90-degree, FHA, F5, F8), and colors can be custom fabricated to your specifications.
Along the eaves, the drip edge is installed directly over the wood deck/furring strip before laying the underlayment. Along the rakes (gables), the drip edge goes on top of the underlayment.
Products are bundled 25 pieces per carton and palletized on reinforced steel pallets (24 cartons/pallet), securely wrapped in protective steel sheets and banded vertically and transversely with steel strapping.
With over 50 dedicated production lines, our standard manufacturing and dispatch lead time is normally within 20 to 30 days following order confirmation.
Our sales engineers respond to project questions during working hours (GST+4).